Why Getting It Right First Time Protects Programme in Live Fit-Outs
In occupied buildings, programme drift starts with early decisions. Clear, buildable solutions shorten decision cycles and keep delivery stable while operations continue.
Programme Risk Builds Quietly Over Time.
In occupied buildings, delays tend to develop gradually. Rework, fatigue, blurred boundaries and deferred decisions all apply steady pressure to the programme. When control weakens early, the final date comes under strain long before anyone notices.
Live fit-outs require a fixed mindset around time. The completion date is agreed early and treated as immovable. Protecting that date depends on discipline applied consistently from the outset.
Segregation Creates Programme Stability.
Clear separation between construction activity and occupied space supports control in live environments. When boundaries and expectations are clear, access windows, noise constraints and working hours become predictable and manageable.
“Communication and segregation are for the tenants. They allow the building to keep operating while work continues.” - Kevin Stanley, Senior Project Manager
Fatigue Directly Impacts Quality and Time.
Night works and early starts are often part of live fit-out delivery. Without careful supervision, fatigue increases the likelihood of errors. Structured shift planning and active supervision reduce mistakes and protect both programme and budget.
“If people are fatigued, quality suffers.” - Kevin Stanley, Senior Project Manager
You always know your client is happy when they ask you to design two more projects. We’ve just completed a second Liberty IT project in Galway and are commencing another project in Belfast .
Patrick Wilding
Design Lead, CBRE Design Collective
Delta Airlines
"Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec orci diam, lacinia ut massa tincidunt, faucibus commodo."
Walt Disney
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec orci diam, lacinia ut massa tincidunt, faucibus commodo.
MetLife
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec orci diam, lacinia ut massa tincidunt, faucibus commodo.
Live buildings demand quality assurance at every stage.
“There’s no cutting corners on quality.” - Michael McFadden, Project Manager
Technical submittals are reviewed before materials reach site. Installations are checked during execution. Consultants, site management and subcontractors operate within a constant inspection cycle.
Buildability Unlocks Efficiency.
Early contractor involvement aligns design intent with construction reality. Clear buildable solutions shorten decision cycles and stabilise delivery.
“That experience builds efficiencies, reduces costs, and limits variations during construction” - Alan Russell, Contracts Manager
“The quality that comes with a Built Interiors job is second to none,”
says Alan Russell, reflecting consistency across projects rather than isolated results.
Early Alignment Prevents Late Friction.
Programme control begins before work starts. Early clarity removes uncertainty when time becomes compressed.
“We identify scope, boundaries and allowances early, and align with tenants and landlords before work starts.” - Darren Kavanagh, Site Manager
In live fit-outs, deadlines function as commitments. Programme certainty comes from craft, planning and consistency applied from start to finish, even while buildings remain fully operational.