. A single misstep in construction can lead to compliance risks, production downtime, or costly delays.
At Built Interiors, we understand that pharma fit-outs aren’t just about construction, they’re about delivering streamlined, efficient projects without disrupting critical operations. Through meticulous planning, advanced technology, and specialist execution, we ensure pharmaceutical plants, research hubs, and live operational environments can evolve without compromising compliance, sterility, or productivity.
1. Technology-Driven Precision: BIM & Point Cloud Surveying
Pharmaceutical facilities are highly complex, with intricate mechanical, electrical, and process systems that must function flawlessly. We use Point Cloud scanning and BIM coordination to model every element of a space before work begins.
This approach:
✔ Prevents clashes between services, reducing rework and costly errors.
✔ Optimises spatial planning, ensuring cleanroom integrity and regulatory compliance.
✔ Minimises material waste, enhancing sustainability and cost efficiency.
At 1 Le Pole Square, this BIM-first strategy ensured streamlined integration of ducting, lighting, and fan coil units in an environment with severe access constraints. The result? A flawless fit-out in a highly restricted environment, a principle even more critical in pharmaceutical settings.
2. Strategic Pre-Planning: Managing Live Environments
Live pharmaceutical environments operate under strict access, noise, and contamination controls. Any disruption can have serious consequences, from failed audits to lost production batches.
Success depends on:
✔ Phased Planning – Structuring work around production schedules to prevent costly shutdowns.
✔ Environmental Control – Managing noise, dust, and contamination risks in cleanrooms and laboratories.
✔ Real-Time Collaboration – Coordinating with facility managers, compliance teams, and end users.
At David Lloyd Leisure, Clonskeagh, we applied the same approach while delivering a 42,000 ft² phased refurbishment in a fully operational high-end leisure facility serving 7,000 members.
Key challenges included:
✔ Noise control – Ensuring works didn’t disrupt fitness classes or spa experiences.
✔ Phased scheduling – Keeping most facilities open while completing complex upgrades.
✔ Strict hygiene standards – Managing dust, debris, and access in areas like spa, pool, and changing rooms.
Through precise scheduling and phased execution, we successfully refreshed and repurposed key spaces including:
• Fitness Studios – Converting an indoor tennis court into four high-tech studio areas.
• Spa & Pool Area – Installing hydro & plunge pools, saunas, feature showers, and relaxation zones.
• Bar & Club Room – Upgrading kitchen, joinery, furniture, and access features.
• Changing Rooms – Stripping out and rebuilding M&E services, DAC toilets, and locker facilities.
These same phased execution principles apply directly to pharmaceutical live environments, ensuring zero disruption to critical operations.