The best construction outcomes often come from the least dramatic stories. No crises, no last-minute theatrics, no scramble to reach the finish line. Instead, a disciplined process, a collective strategy and a shared understanding of what excellence looks like. That rhythm defined the delivery of 1 Le Pole Square.

This project brought together Built Interiors and CBRE Design Collective with clear intent. Every detail was planned with precision. Every interface between design, logistics, trades and programme was mapped with care. Collaboration was not a slogan for this team. It was a working method, carried through pre-construction, procurement, site coordination and the final stages where pristine finishes rely on absolute discipline.

Barry Keenan FCIOB, Managing Director at Built Interiors, described the dynamic clearly:

“Strong collaboration keeps a project steady. When the design team and contractor move in sync, you gain certainty. Everyone can focus on quality without distraction.”

The Built360 methodology shaped that approach. It supported early involvement, open communication and a culture where challenges surfaced early and solutions arrived quickly. It kept the project anchored to three fundamentals: certainty of time, certainty of quality and exacting delivery from start to finish. These principles mattered in a live urban environment where access restraints, noise windows and neighbouring occupiers shaped the rhythm of the programme.

You always know your client is happy when they ask you to design two more projects. We’ve just completed a second Liberty IT project in Galway and are commencing another project in Belfast .

Patrick Wilding
Design Lead, CBRE Design Collective
Delta Airlines
"Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec orci diam, lacinia ut massa tincidunt, faucibus commodo."
Walt Disney
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec orci diam, lacinia ut massa tincidunt, faucibus commodo.
MetLife
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Donec orci diam, lacinia ut massa tincidunt, faucibus commodo.

Alan Russell , Contracts Manager at Built Interiors, captured this mindset:

“Crisp finishes come from rigorous planning. Built360 gives structure to the process and leaves no space for drift. The standard remains the standard from day one.”

The results were visible long before handover. Clean detailing, efficient sequencing and the quiet confidence that comes from collective control of the build. The design team’s ambition was achieved because every decision aligned with the agreed standard.

The project stands as a clear example of what disciplined collaboration can achieve. The delivery of 1 Le Pole Square showed how a shared method, steady leadership and aligned expectations create an environment where quality stays consistent from the first day on site to the final handover. The industry’s recognition reflects the clarity, control and craftsmanship that defined every stage of the build.

ollaboration will continue to shape the modern fit out sector. The experience at 1 Le Pole Square shows how strong partnerships and a well-tested methodology can raise the benchmark for quality in busy urban environments.

See the full case study.